This is a demo of the Pro - View management area | Choose this template
Plan No. 2026-04 · Lanaudière and North Shore · scale 1:100

An empty lot in spring. A place to live in July.

Design, pavers, retaining walls, decks, planting and maintenance. A written budget, a schedule we keep, and your yard swept every evening before we leave.

Projects

Four projects · sector and work performed
Before
After
Repentigny, Le Gardeur area · 11 days on site

New construction, blank slate

Clay soil left as-is by the builder, with no drainage. We redid the entire grading before installing anything.

Grading and drainage · 620 sq ft paver driveway · walkway · 34 linear ft block wall · 4,200 sq ft of sod · 9 shrubs, 2 trees, cedar mulch beds
Before
After
Terrebonne, Seigneurs area · 8 days on site

Backyard redone after 25 years

Rotten old deck, dandelion-covered lawn, a cedar hedge yellowed on one side. We cleared everything and started fresh from the ground up.

Demolition and disposal · 380 sq ft paver patio · 3-step stone staircase · perennial beds · 9-point LED outdoor lighting · full reseeding
Before
After
L'Assomption, riverside · 6 days on site

Wood deck and dining area

A large flat lot, but nowhere to sit outside. The owners wanted to eat outdoors without sitting in wet grass.

340 sq ft treated hemlock deck on screw piles · railing · full-width steps · two framing beds · 14-cedar hedge
Before
After
Mascouche · 14 days on site

In-ground pool landscaping

After the contractor installed the pool, a dirt crater remained. We built the entire surround, fencing and access.

1,150 sq ft paver surround · 52 linear ft retaining wall · stone staircase · backyard grading · 4-zone irrigation · sod and planting

The season calendar

Our working year, from thaw to first snow

April · May · June
Spring
Lawn openings, cleanup, edging repairs
Sod and seeding: the best time of year
Tree and shrub planting
Paver projects start as soon as the ground fully thaws
First mowing and first fertilization
July · August
Summer
Peak construction season: pavers, walls, decks
Mowing and hedge trimming every two weeks
Weeding and mulch top-up
Irrigation system adjustments
Watering to help new plantings establish
September · October · November
Fall
Aeration, topdressing and lawn overseeding
Second-best window for planting and laying sod
Big cleanup, leaf removal
Irrigation system winterizing
Installing stakes and snow guards
December · January · February · March
Winter
Residential and commercial snow removal
Planning next season's projects
Meetings and quotes: the best time to reach us
Ordering materials and reserving plants
Equipment maintenance

What Our Clients Say

The 2027 book

Big projects fill up by February.

A full landscaping job needs a plan, ordering materials and plants, then a 5-to-15-day work window. By May, our season's book is 90% full.

Maintenance contracts and small jobs (beds, sod, paver repairs) can be scheduled all season, from mid-April to the end of October.

✓ Product added to cart!
Edit mode Click any text or image to edit it List item add/remove: to be redone in each language (FR/EN) Done
Pages: Home About Services Hours Contact Blog